
Infrastructure Technology Institute
Bridge Asset Management Based on Life Cycle Cost Considerations |
|||
Year | Title |
Author(s) |
File |
| Life Cycle Cost of Bridges: Parts I & II (TEA-21 Years 4-6 Final Report) | |||
| 2006 | Chinese construction firms in reform. Proc. Symposium on Construction in Developing Countries: New Issues and Challenges, Santiago, Chile. | Wang, D., Hadavi, A., Krizek, R.J. | N/A |
| 2006 | A comparative study of market structure in the Chinese construction industry. Proc. Symposium on Construction in Developing Countries: New Issues and Challenges, Santiago, Chile. | Wang, D., Krizek, R.J., Hadavi, A. | N/A |
| 2005 | Life cycle cost analysis of bridges and tunnels. Proc. Construction Research Congress, San Diego, California, pp. 131-135. | Zhang, Y., Novick, D., Hadavi, A., Krizek, R.J. | N/A |
| 2003 | Empirical Study of Life-Cycle Cost Analysis for Bridges | Ahmad Hadavi | |